Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Moving at last

Share price is out of the 3.5/4c rut, with over 2 million traded so far today, we are up to 5.5c.

If news of actually signing the agreement for milling comes before the inevitable drawback, it would be good.

Share
New Message
Please login to post a reply