So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Production going up to 100,000ozs/yr

On the GBB Forum, Frank said "We will try to proceed with the rolling start stage of processing the minerialized material from Granada by custom milling. During that stage we will try to increase the resource by 1-2 million ounces by drilling defined targets to the north. We should be able to also make a decision on taking the production to 100,000 ounces per year as our next processing target."

The present production target is 73,000 ozs over 3 years, so this would mean around a fourfold increase in production, presumably sometime after that first 3 year period.