Exploring for Zinc, Gold, and Uranium
A Canadian company exploring a diverse and high-quality portfolio of mineral projects in Western Canada and Guatemala
Hub Controls
  • Control Panel Demo
  • Upload Photo
  • Edit Company Profile
  • Add a Link
  • Update Fast Facts
  • Add Management Bios
  • Private Messages
  • Edit Your Profile

Email Updates

AGORACOM News Flash

AGORACOM SYSTEM UPDATE COMPLETE


Agoracom.com has been updated - Friday 5:40 pm EST. If you discover any bugs or errors, please let us know on the contact form.

 

Thanks for continuing to support us with your feedback and suggestions.

From The Agoracom Team 

Firestone Ventures Profile

Firestone Ventures Inc.
(FV: TSX-V) (F5V: Frankfurt)
COPPER and SILVER in Botswana


Exploring a Diverse, High-Quality Portfolio of Mineral Projects in Western Canada and Guatemala


Torlon Hill Project, Guatemala (ZINC) - New zone of high-grade zinc discovered in 2007. Exploration has been highlighted by many high-grade drill intersections from a 3,493-metre drill program

Sonora Project, Yukon Territory (GOLD, SILVER, COPPER) - High-grade drill intercepts open at depth. Located near Sherwood Copper’s Minto mine development. Drilling to start in summer, 2007.

Alberta Sun Project, Alberta (URANIUM) - Initial surface exploration for roll-front uranium deposits yields positive results on a large land position.




TORLON HILL PROJECT - Zinc

  • 41-hole, 3,493-metre drill program now complete.
  • New zone of high-grade zinc discovered on west side of Torlon Hill.
  • Significant intersections of high-grade zinc during drill campaign, with key assays from 3% to 42.3% zinc and 0.5% to 4.5% lead. Widths of mineralization ranged from 1.5 to 53 metres.
  • Mineralization is mostly smithsonite (zinc) and lead carbonates with minor amounts of lead sulphide (galena).
  • SGS Lakefield Limited to conduct preliminary metallurgical testing.

SONORA PROJECT - Gold, Silver, Copper

  • Drilled 1,821 metres in 12 holes, late 2006. Next phase of exploration, including 2,725 metres of drilling, is scheduled to begin summer 2007.
  • Amadeus Zone returned drill intercept of 6.21 g/t Au across 15.3 m, open at depth, including 12.9 g/t Au across 5.0 m.
  • High-grade intersection open at depth in area never drilled.
  • Results of separate 2006 Amadeus Zone hole included intercept of 50.1 g/t silver, with 0.321 g/t gold across 19.9 meters.
  • 40 km from Sherwood Copper’s Minto mine development project.

ALBERTA SUN PROJECT – Uranium

  • Firestone holds 100% interest in 207,750 acres prospective for roll-front uranium deposits.
  • Completed 2,384 line kilometers of airborne electromagnetic and magnetic surveying in 2006/2007.
  • TerraNotes of Edmonton, Alberta currently conducting preliminary analysis of data, to be followed by sophisticated modeling of the dataset.
  • Main purpose of the survey is identify buried stream channels and potential sites of sandstone-hosted uranium.


FAST FACTS

Detailed Stock Quote & Chart
Press Releases
December 2007 Corporate Presentation

Last changed at 05-May-2008 02:14PM by AGORACOM
Executive Address
Fv-walton-ea
Lori Walton
President & CEO
April 15, 2008

Lori Walton provides an update on Torlon Hill, a high-grade zinc-lead project situated in Guatemala

View Broadcast