Exploring for Zinc, Gold, and Uranium
A Canadian company exploring a diverse and high-quality portfolio of mineral projects in Western Canada and Guatemala
Hub Controls
  • Control Panel Demo
  • Upload Photo
  • Edit Company Profile
  • Add a Link
  • Update Fast Facts
  • Add Management Bios
  • Private Messages
  • Edit Your Profile

Email Updates

AGORACOM News Flash

AGORACOM SYSTEM UPDATE COMPLETE


Agoracom.com has been updated - Friday 5:40 pm EST. If you discover any bugs or errors, please let us know on the contact form.

 

Thanks for continuing to support us with your feedback and suggestions.

From The Agoracom Team 

Firestone Ventures > Press Release
Agoraa_profile_profile

NEWS - Firestone Ventures Intersects 19.81 Metres of 10.01% Zinc, 4.66% Lead at Torlon Hill

Posted by: AGORACOM on April 15, 2008 06:00AM

EDMONTON, ALBERTA - (April 15, 2008) - Firestone Ventures Inc. (TSX VENTURE: FV) (FRANKFURT: F5V) is pleased to announce results from the next nine drill holes at the Company's Torlon Hill high-grade zinc-lead project, situated in western Guatemala. A total of 1,699.3 metres (23 vertical drill holes) of the planned 3,700 metre winter 2008 drill campaign has been completed to date. The drill program will be on-going until June, 2008. A total of 4,935 metres was drilled previously in 2006 and 2007.

Highlights from the new drill results include:

- Hole TH08-74 39.63 m of 5.14% zinc, 1.81% lead and 17.81 g/t silver

- Hole TH08-75 15.00 m of 4.44% zinc, 1.29% lead and 9.67 g/t silver

- Hole TH08-76 3.05 m of 11.67% zinc, 1.96% lead and 16.12 g/t silver

- Hole TH08-78 12.01 m of 6.58% zinc, 3.46% lead and 20.48 g/t silver

- Hole TH08-80 19.81 m of 10.01% zinc, 4.66% lead and 13.83 g/t silver

"We are very encouraged by these latest drill results," says Lori Walton, President of Firestone Ventures Inc. "In particular, we are pleased by the intervals of buried zinc-lead mineralization that have no surface expression."

A map showing the drill hole locations is available at www.firestoneventures.com , along with drill hole specifications. A table showing significant drill intersections is provided at the end of this news release.

Holes TH08-72 through TH08-77 were drilled northwest of previous drilling, where there is no surface expression of zinc mineralization. Holes TH08-78 to 80 were infill and expansion holes drilled along the eastern boundary of the main "Bulge" area of surface zinc mineralization. Drill Hole TH08-79 intersected unmineralized serpentinite. Results are pending from drill holes TH08-81 to 85, also along the eastern boundary of the "Bulge".

The drill has now moved to test the area around drill hole TH07-53, which intersected 42.5 metres grading 9.7% zinc, 4.7% lead and 20 g/t silver at 55.5 m depth. The drill will then move south to test zinc-lead soil anomalies south of the previously drilled area.

Mineralization at the intensely oxidized Torlon Hill deposit consists largely of smithsonite (a zinc carbonate mineral) cross-cut by galena (lead sulphide) veinlets. The deposit is contained within a shallowly southeast-dipping body measuring approximately 400 metres long, 20 to 100 metres wide and up to 30 metres thick. Previous high-grade drill intersections include 25 metres of 26.77% zinc, 1.42% lead, 5.98% silver and 53.3 metres of 9.66% zinc, 1.86% lead and 12.21 g/t silver (see news release dated Oct. 4, 2007). Most mineralization defined by drilling to date occurs on or near surface. The deposit is still open to expansion, mainly to the west and south.

This news release has been reviewed and approved by J. Cleary, CPG, Qualified Person. The road-accessible Torlon Hill project is located 18 kilometres northwest of the city of Huehuetenango, which is situated on the Pan-American Highway in western Guatemala. Sample preparation, quality control and analytical techniques have been described previously (see March 19, 2008 news release). All samples were analyzed by ALS Chemex in Vancouver, B.C.

Firestone Ventures Inc. is a well-financed Canadian-based resource exploration and development company with zinc, gold and uranium projects in Western Canada and Central America. The common shares of the Company are currently listed on the TSX Venture Exchange (symbol FV) and the Frankfurt Stock Exchange (symbol F5V).

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Firestone Ventures Inc.

Lori Walton, P. Geol.

President

Toll Free: 1-888-221-5588

Fax: (780) 428-3476

Email: info@firestoneventures.com

Website: www.firestoneventures.com

or

Contact Financial Inc.

Investor Relations

(604) 689-7422

Email: FV@agoracom.com

Website: www.agoracom.com/IR/Firestone

Post a Reply

Please login to reply to this message.

Executive Address
Fv-walton-ea
Lori Walton
President & CEO
April 15, 2008

Lori Walton provides an update on Torlon Hill, a high-grade zinc-lead project situated in Guatemala

View Broadcast