Based on the scale bar and my trusty ruler, the distance from the most westerly tip of hole 2 to the most easterly tip of deepened hole 4 is now over 900 metres.
Hole 6 being drilled to 700 metres looks like it will take the 400 metre depth from the RTZ Hole 1 to over 600 metres horizontal depth.
The potential increase in size is plus 50% on going from 400 m. down to 600 m. WITHOUT factoring the increases being added to the east and to the west.
Looking like we are going for the supersize combo!
Would you like a side of Pasacancha Silver with that?