HANA Mining Ltd. (HMG: TSX-V)
COPPER and SILVER in Botswana
Hana Mining is a junior mineral explorer seeking to acquire, explore and develop precious, base metal and other mineral exploration projects. Currently the Company is focusing on exploring and developing its Ghanzi Copper-Silver project in northwestern Botswana.
FAST FACTS
HANA Mining – CORPORATE PRESENTATION

Click image to launch presentation
GHANZI COPPER-SILVER PROJECT
Located in northwestern Botswana, the Ghanzi Copper-Silver Project consists of five license blocks covering approximately 4,370 square kilometers (437,000 hectares). Hana mining is in the advanced stages of a 10,000 meter drill program at the Ghanzi Copper-Silver Project.
The project area lies within the Late Proterozoic Damaran rift sequence of the Pan African Mobile Belt. These same rocks host the world-class deposits of the Zambian Copper Belt, which contains roughly 30% of the world's copper reserves.
RECENT NEWS
On March 6, 2008, Hana Mining announced results from four new holes completed as part of its ongoing 10,000-meter diamond drilling program. All four holes intersected varying amounts of copper-silver mineralization within the H-I area. Highlights include 7.0 meters grading 1.80% copper, 23.98 grams per tonne (g/t) silver, 674 parts per million (ppm) molybdenum and 3.28 ppm rhenium in hole HA-10-D. This intercept includes a very high-grade section that returned 0.5 meters grading 20.5% copper, 285 g/t silver, greater than 10,000 ppm molybdenum and greater than 50 ppm rhenium. Results from the additional holes are pending and will be reported as they are received and compiled.
Click here to view press release
The four holes were collared in the H-I grid area (see map below) of the property, with the following results:
| Hole No. | From (m) | To (m) | Core Length (m) | Total Copper (%) | Silver (g/t) | Moly (ppm) | Rhenium (ppm) |
| HA-04-D | 57.0 | 68.0 | 11.00 | 0.58 | 4.67 | 12.40 | 0.04 |
|
| 58.0 | 61.0 | 3.00 | 1.10 | 7.80 | 19.07 | 0.03 |
| HA-10-D | 157.0 | 164.0 | 7.00 | 1.80 | 23.98 | 674.10 | 3.28 |
|
| 159.8 | 160.3 | 0.50 | 20.5 | 285 | < 10000 | <50 |
|
| 168.0 | 173.0 | 5.00 | 0.49 | 5.55 | 56.20 | 0.12 |
| HA-11-D | 167.0 | 180.0 | 13.00 | 0.36 | 4.51 | 41.90 | 0.11 |
|
| 167.0 | 169.0 | 2.00 | 0.55 | 2.63 | 89.49 | 0.22 |
|
| 176.0 | 178.0 | 2.00 | 0.92 | 17.22 | 99.12 | 0.40 |
| HA-12-D | 240.0 | 243.0 | 3.00 | 0.52 | 7.66 | 24.63 | 0.07 |

Historical records from the H-I grid area show 27 RC and 11 diamond drill holes were completed along a 1.5 -kilometer-long mineralized zone with intercepts of intercepts of: 1.80 %Cu/14m (136m), 2.60 %Cu/7.0m (37m), 2.56 %Cu/12.0m (86m), 1.09 %Cu/14.0m (125m)
Discussing the ongoing 10,000 meter drill program at the Ghanzi Copper-Silver project